Hand off the delivery. Keep the outcome under your control.

A 4-5 engineer PRO Squad with its own Tech Lead. Conectia owns the engineering; your team owns the product. Demo every two weeks, scorecard against your KPI.

COMPOSITION · 5 ROLES

What a squad actually looks like

Default shape. Adjusts to your product surface — but the Tech Lead is non-negotiable.

TL

Tech Lead

Architecture, code review, escalation. Owns the squad output.

BE

2× Backend

Domain modelling, APIs, data pipelines.

FE

Frontend

Product UI, design system, performance.

QA

QA / SDET

Automation suite, contract tests, release gating.

+AI

+ AI Engineer

Optional: LLM apps, RAG, evals when product needs AI.

CADENCE · DELIVERY RHYTHM

How a sprint actually runs

Same ceremonies an internal squad would run. We bring the discipline; your product team stays in the loop.

D1

Sprint zero kickoff

Backlog grooming with your PM. Architecture map. Definition-of-done locked.

W1-2

Daily sync + first PR

Same Slack, same standup. First merged PR before end of week 1.

W2

Bi-weekly demo

Live demo to stakeholders. No deck. Working software or rollback plan.

W2

Retro + scorecard

Retro with your team. Scorecard against the KPI we signed against.

MODELS · 3 SHAPES

Which squad fits the bet you are running

All three are full-stack squads. The bet they are placed against changes the cadence and the scorecard.

Delivery Squad

Ship a defined product slice. Best when scope is clear and you need throughput.

Best for: roadmap-bound builds, post-PMF teams scaling features.

Discovery Squad

Run discovery + first build cycle. Spike, prototype, iterate with users.

Best for: pre-PMF, new product line, AI experiments to production.

Platform Squad

Build the foundation: infra, dev experience, observability, design system.

Best for: Series A→B platform debt, multi-team enablement.

OWNERSHIP · OUTCOME LOCK

Where the line is drawn

YOU OWN
  • Product strategy and KPI
  • Stakeholder management
  • Final accept/reject on demo
WE OWN
  • Tech Lead, code quality, retros
  • Sprint cadence and ceremonies
  • Replacement, ramp-up, knowledge handoff

Just need individual engineers, not a full PRO Squad? See Staff Augmentation →

Agreement on the outcome, not on the input

30-minute scoping call with a CTO. We agree the KPI before we agree the price. If the KPI isn't reached, the next sprint runs on us.